We made a small change to a few of our measures by renaming them and noticed that this caused all of the Calculated Measures that were referencing them to no longer work. While this isn't a big deal now, I could see this being problematic when the number of calculated measures gets larger.
When creating a calculated measure, is there a way to reference the ID of the measures you are using to prevent it from breaking if the measures are renamed at some point?